Pencarian Surat
Hasil (50 surat, halaman 511)
| Index Surat | Nomor Surat | Perihal | Asal Surat | Tgl Surat | Tgl Terima | No. Agenda | Dispos | |
|---|---|---|---|---|---|---|---|---|
| 0342/11/2022 | INVOICE #066/PDAM/XI/2022 | PEMBAYARAN AIR CURAH OLAHAN PRODUKSI WTP PT.GRENEX KONTRAK PDAM NO. 01/SPKS/PDAM/Bks/I/2016 | PT. GRENEX TIRTA INDONESIA | 2022-11-14 | 2022-11-16 | 2417 | 3 | Detail |
| 0341/11/2022 | INVOICE SIRJ22110008/PDAM/XI/2022 | PEMBAYARAN AIR CURAH OLAHAN PRODUKSI WTP PT.GRENEX GRADIANT BABEBALAN IN NO.43/PKS/PDAM/BKS/IX/2020 | PT. GRENEX GRADIANT BABELAN | 2022-11-14 | 2022-11-16 | 2416 | 3 | Detail |
| 0340/11/2022 | 068/DPR/III/11/2022 | PEMBERITAHUAN AKSI | DEPARTEMEN PEMBELA RAKYAT | 2022-11-10 | 2022-11-16 | 2415 | 3 | Detail |
| 0339/11/2022 | 63/KEU/03/PDAM-BKS/XI/2022 | USULAN PEMBAYARAN PPH 21 | P02 | 2022-11-16 | 2022-11-16 | 0198/11 | 3 | Detail |
| 0338/11/2022 | 164/Int.Peg/PDAM/XI/2022 | USULAN UANG PENGHARGAAN MASA KERJA | P13 | 2022-10-24 | 2022-11-16 | 0197/11 | 3 | Detail |
| 0337/11/2022 | 105/US/TK/Cab.Taruma Jaya/Bks/XI/2022 | USULAN BIAYA PEKERJAAN EVALUASI ALIRAN AIR KP.TURIJAYA | S06 | 2022-11-09 | 2022-11-16 | 0196/11 | 3 | Detail |
| 0336/11/2022 | 104/US/TK/Cab.Taruma Jaya/Bks/XI/2022 | USULAN BIAYA PEKERJAAN PEMASANGAN GATE VALVE DIA 8" HARAPAN MULYA REGENCY | S06 | 2022-11-09 | 2022-11-16 | 0195/11 | 3 | Detail |
| 0335/11/2022 | 103/US/TK/Cab.Taruma Jaya/Bks/XI/2022 | USULAN BIAYA PEKERJAAN PENGGANTIAN GATE VALVE DIA 3" KP.TURIJAYA GG 5 | S06 | 2022-11-09 | 2022-11-16 | 0194/11 | 3 | Detail |
| 0334/11/2022 | 102/US/TK/Cab.Taruma Jaya/Bks/XI/2022 | USULAN BIAYA PEKERJAAN PEMASANGAN GATE VALVE DIA 2",DIA 3",DAN DIA 4" PERUM GRIYA SEGERA RESIDENCE,KP.KELAPA | S06 | 2022-11-16 | 2022-11-16 | 0193/11 | 3 | Detail |
| 0333/11/2022 | 101/US/TK/Cab.Taruma Jaya/Bks/XI/2022 | USULAN BIAYA INTERKONEKSI JARINGAN PIPA DISTRIBUSI 2" KP. BALI BENDUNGAN | S06 | 2022-11-09 | 2022-11-16 | 0192/11 | 3 | Detail |
| 0332/11/2022 | SD.UND-886/GMI.DOP/UW/11/2022 | UNDANGAN | PERUM JASA TIRTA II | 2022-11-09 | 2022-11-15 | 2414 | 3 | Detail |
| 0330/11/2022 | XXX | BIAYA SPPD TANGGAL 16 - 17 NOVEMBER 2022 | P02 | 2022-11-15 | 2022-11-15 | 0191/11 | 1 | Detail |
| 0329/11/2022 | 173/Us.Int/PDAM/Bks/XI/2022 | USULAN BIAYA PROTOKOLER DAN MASTER CEREMONY | P13 | 2022-11-14 | 2022-11-15 | 0190/11 | 3 | Detail |
| 0328/11/2022 | 174/Us.Int/PDAM/Bks/XI/2022 | USULAN BIAYA APLIKASI IPROCS | P13 | 2022-11-14 | 2022-11-15 | 0189/11 | 3 | Detail |
| 0327/11/2022 | XXX | DAFTAR RINCIAN TAGIHAN PREMI DAPENMA PAMSI DIREKSI PDAM TIRTA BHAGASASI BULAN OKTOBER 2022 | P13 | 2022-11-15 | 2022-11-15 | 0188/11 | 1 | Detail |
| 0326/11/2022 | XXX | PERMOHONAN BANTUAN DANA PENTAS SENI MUSIK DANGDUT | SJ PRODUCTION (SOCIETY JUNIOR) | 2022-11-15 | 2022-11-15 | 2412 | 3 | Detail |
| 0325/11/2022 | 09/YNQ/10/2022 | PERMOHONAN BANTUAN DANA | YAYASAN NURUL QOMARIAH | 2022-10-17 | 2022-11-15 | 2411 | 3 | Detail |
| 0324/11/2022 | 50/Lap/Kcp.Bjm/PDAM-TB/BKS/11/2022 | LAPORAN KINERJA PEGAWAI AN.ASAN STAFF PELAKASANA IPA | S15 | 2022-11-14 | 2022-11-15 | 0187/11 | 2 | Detail |
| 0323/11/2022 | 600/2179/DBMSDA.Bimar | PERMOHONAN PERTIMBANGAN TEKNIS | DINAS BINA MARGA DAN SDA | 2022-11-15 | 2022-11-15 | 2410 | 3 | Detail |
| 0322/11/2022 | XXX | PERMOHONAN TUNJANGAN KELUARGA AN.SARI TASYA PELAKSANA TEKNIK DAN OPERASI | S09 | 2022-11-15 | 2022-11-15 | 0186/11 | 2 | Detail |
| 0320/11/2022 | 130/Us/LAB/PDAM/Bks/XI/2022 | PENGADAAN STOCK BAHAN KIMIA LABORATORIUM | P07 | 2022-11-11 | 2022-11-15 | 0184/11 | 4 | Detail |
| 0319/11/2022 | 0891/SRT-TDS/XI/2022 | PERMOHONAN PERUBAHAN DARI WATER METER UKURAN DIA 2" MENJADI WATER METER DIA 1" | HONDA PRIMA | 2022-11-11 | 2022-11-15 | 2409 | 3 | Detail |
| 0318/11/2022 | 200/TK/Cab.PondokUngu/XI/2022 | PERMOHONAN PENGGANTIAN WATER METER (WM) DIA 3" PT.SANTIKA (HOTEL SANTIKA) HARAPAN INDAH | S07 | 2022-11-14 | 2022-11-15 | 0183/11 | 4 | Detail |
| 0317/11/2022 | 106/US/TK/Cab.Taruma Jaya/Bks/XI/2022 | USULAN BIAYA PEKERJAAN PEMASANGAN WASH OUT 2" | S06 | 2022-11-09 | 2022-11-15 | 0182/11 | 3 | Detail |
| 0316/11/2022 | 591/PDAM/CWA/Bks/XI/2022 | USULAN PENAMBAHAN KARYAWAN | S16 | 2022-11-14 | 2022-11-15 | 0181/11 | 2 | Detail |
| 0315/11/2022 | LH.05.01/4162/GAKUM/DLH/2022 | UNDANGAN | DINAS LINGKUNGAN HIDUP KAB BKS | 2022-11-08 | 2022-11-14 | 2408 | 3 | Detail |
| 0314/11/2022 | XXX | RAPAT PENGESAHAN RKA TAHUN BUKU 2023 PDAM TB BEKASI SESUAI SK DIREKSI NO.109/KEP/PDAM/BKS/X/2022 | P02 | 2022-11-14 | 2022-11-14 | 0180/11 | 1 | Detail |
| 0313/11/2022 | XXX | HONOR TIM RKA TAHUN BUKU 2023 PDAM TB BEKASI SESUAI SK DIREKSI NO.109/KEP/PDAM/BKS/X/2022 | P02 | 2022-11-14 | 2022-11-14 | 0179/11 | 1 | Detail |
| 0312/11/2022 | XXX | DAFTAR UANG KERJA KHUSUS TIM PENYUSUNAN RENCANA KERJA ANGGARAN PERUSAHAAN PDAM TIRTA BHAGASASI BEKASI THN 2023 | P02 | 2022-11-14 | 2022-11-14 | 0178/11 | 1 | Detail |
| 0311/11/2022 | 04/Usl/PP/PDAM-TB/XI/2022 | IMPLEMENTASI APLIKASI iPROCS | P20 | 2022-11-10 | 2022-11-14 | 0177/11 | 3 | Detail |
| 0310/11/2022 | 03/Usl/PP/PDAM-TB/XI/2022 | SOSIALISASI PERDIR PENGADAAN BARANG/JASA | P20 | 2022-11-08 | 2022-11-14 | 0176/11 | 3 | Detail |
| 0309/11/2022 | 60/KEU01/PDAM/XI/2022 | PERMOHONAN HONOR RAPAT DAN AKOMODASI OPERASIONAL RKA TAHUN 2023 | P02 | 2022-11-14 | 2022-11-14 | 0175/11 | 3 | Detail |
| 0308/11/2022 | 3605/B.04.01/2022 | PERMOHONAN IZIN PENGGAMBILAN DATA | UNIV.MUHAMMADIYAH PROF.DRHAMKA | 2022-11-10 | 2022-11-14 | 2407 | 3 | Detail |
| 0307/11/2022 | 54/Us/KCP.Tambelang/PDAM/BKS/XI/2022 | USULAN INTERKONEKSI PIPA DISTRIBUSI DIA 8" KE DIA 2" | S24 | 2022-11-14 | 2022-11-14 | 0174/11 | 3 | Detail |
| 0306/11/2022 | 53/Us/KCP.Tambelang/PDAM/BKS/XI/2022 | USULAN PENGGANTIAN VALVE POMPA DISTRIBUSI DIA 3" | S24 | 2022-11-14 | 2022-11-14 | 0173/11 | 3 | Detail |
| 0305/11/2022 | 52/Us/KCP.Tambelang/PDAM/BKS/XI/2022 | USULAN PENGGANTIAN PIPA BUANG LUMPUR DIA 4" IPA K-20 L/D | S24 | 2022-11-14 | 2022-11-14 | 0172/11 | 3 | Detail |
| 0304/11/2022 | 51/Us/KCP.Tambelang/PDAM/BKS/XI/2022 | USULAN REHAB JARINGAN PIPA KIMIA IPA K-20 L/S | S24 | 2022-11-14 | 2022-11-14 | 0171/11 | 3 | Detail |
| 0303/11/2022 | 04/ADM-CV.KK | PERMOHONAN PEMBAYARAN PEKERJAAN PENGADAAN INVESTARIS KANTOR SPK NO.05/SPK-OP/NO KONSTUKSI/PP/PDAM-Bks/IX/2022 | CV.KARTIKA KAROMAH | 2022-11-14 | 2022-11-14 | 2406 | 3 | Detail |
| 0302/11/2022 | RT.04/1525-DPRD/2022 | RAPAT KERJA PANSUS 21 | DPRD KABUPATEN BEKASI | 2022-11-14 | 2022-11-14 | 2405 | 3 | Detail |
| 0301/11/2022 | 1826/PUR.10.01/Harbang | PERMOHONAN RELOKASI PIPA AIR BAWAH TANAH MILIK PDAM TIRTA BHAGASASI (TEMBUSAN UNTUK DIREKTUR UTAMA PDAM TB BEKASI) | DINAS BINA MARGA TATA RUANG | 2022-11-07 | 2022-11-14 | 2404 | 3 | Detail |
| 0300/11/2022 | 65/Usl.Dist/PDAM-BKS/XI/2022 | USULAN PERBAIKAN KEBOCORAN CABANG CIKARANG SELATAN JL. RAYA SUKADAMI | P04 | 2022-11-11 | 2022-11-14 | 0170/11 | 4 | Detail |
| 0299/11/2022 | 64/Usl.Dist/PDAM-BKS/XI/2022 | PENGADAAN HARDISK EKSTERNAL UNTUK BANK DATA AS BUILD DRAWING CABANG DAN KCP | P04 | 2022-11-10 | 2022-11-14 | 0169/11 | 3 | Detail |
| 0298/11/2022 | 88/PD/XI/2022 | LATIHAN BERSAMA | PERPAMSI JAWA BARAT | 2022-11-11 | 2022-11-14 | 2403 | 3 | Detail |
| 0297/11/2022 | 004/BFW-4/X/2022 | PERMOHONAN SPONSORSHIP | BEKASI KEREN | 2022-11-11 | 2022-11-11 | 2402 | 3 | Detail |
| 0296/11/2022 | 05/A/MD-KT.BKS/XI/2022 | PERMOHONAN DANA | KAHMI KOTA BEKASI | 2022-11-04 | 2022-11-11 | 2401 | 3 | Detail |
| 0295/11/2022 | 005/7118/DPRD PP | UNDANGAN | DPRD KOTA BEKASI | 2022-11-11 | 2022-11-11 | 2400 | 3 | Detail |
| 0294/11/2022 | XXX | PENGAJUAN PENGGANTIAN SALURAN PIPA PDAM | BADARUZZAMAN | 2022-11-11 | 2022-11-11 | 2399 | 3 | Detail |
| 0293/11/2022 | 14/USL/KCP.STM/PDAM.TB/X/2022 | USULAN PERGANTIAN PRINTER | S19 | 2022-10-31 | 2022-11-11 | 0168/11 | 3 | Detail |
| 0292/11/2022 | 112/Teknik/C.RL/PDAM-Bks/XI/2022 | USULAN PEMBUATAN RAB KEBOCORAN DIA 8" JL.PRAMUKA JEMBATAN 0 | S05 | 2022-11-09 | 2022-11-11 | 0167/11 | 3 | Detail |
| 0291/11/2022 | 111/Teknik/C.RL/PDAM-Bks/XI/2022 | USULAN PEMBUATAN RAB KEBOCORAN DIA 8" JL.PRAMBANAN | S05 | 2022-11-09 | 2022-11-11 | 0166/11 | 3 | Detail |
+ Tambah Surat Baru (INSERT tm_surat)
Backup data sebelumnya?