Pencarian Surat
Hasil (50 surat, halaman 181)
| Index Surat | Nomor Surat | Perihal | Asal Surat | Tgl Surat | Tgl Terima | No. Agenda | Dispos | |
|---|---|---|---|---|---|---|---|---|
| 0400/04/2025 | XXX | HONOR JOIN SURVEY LOKASI RENCANA RELOKASI PIPA JDU PROSES REKOMENDASI PEMANFAATAN DAERAH MILIK JLN DAN JEMBATAN PRMASTOM | P01 | 2025-04-14 | 2025-04-30 | 0253/04 | 3 | Detail |
| 0399/04/2025 | 110/01/S25/PERUMDA-TB/Bks/IV/2025 | Permohonan Dibuatkan Rencana Anggaran Biaya RAB Pekerjaan perbaikan kebocoran Pipa PVC dia 10" Di depan perumahan Bumi a | S25 | 2025-04-23 | 2025-04-30 | 0252/04 | 3 | Detail |
| 0398/04/2025 | 10/Hublang/PERUMDA TB/Bks/IV/2025 | USULAN PENAMBAHAN PEMBACA METER | P03 | 2025-04-30 | 2025-04-30 | 0251/04 | 3 | Detail |
| 0397/04/2025 | 400.14.5.1/902-DPRD/2025 | UNDANGAN RAPAT PARIPURNA DPRD KABUPATEN BEKASI | DPRD KAB BEKASI | 2025-04-29 | 2025-04-30 | 761 | 3 | Detail |
| 0396/04/2025 | 10/EXT/KOPKAR-TM/BKS/IV/2025 | PERMOHOINAN PERUBAHAN STATUS PEMBACA METER KOPERASI KONSUMEN KARYAWAN TIRTA MUKTI MENJADI PEGAWAI PERUMDA TB | KOPKAR TIRTA MUKTI | 2025-04-30 | 2025-04-30 | 760 | 3 | Detail |
| 0395/04/2025 | 003/RA[/PERUMDA-TB/BKS/IV/2025 | UNDANGAN | KPM PERUMDA TIRTA BHAGASASI | 2025-04-29 | 2025-04-30 | 759 | 5 | Detail |
| 0394/04/2025 | UM 0102-Ca/88 | KOORDINASI LINTAS SEKTOR DALAM RANGKA PENGAWASAN KUALITAS AIR MINUM BUMD AIR MINUM TAHUN 2025 | KEMENPU DIRJEN CIPTA KARYA | 2025-04-28 | 2025-04-30 | 758 | 3 | Detail |
| 0393/04/2025 | 120/01/S28/PERUMDA-TB/Bks/IV/2025 | USULAN KEGIATAN PENGURASAN WASH OUT | S28 | 2025-04-30 | 2025-04-30 | 0250/04 | 4 | Detail |
| 0392/04/2025 | 025/JB/III/2025 | PERMOHONAN PEMBAYARAN | CV.JURNAL BARU | 2025-04-30 | 2025-04-30 | 757 | 3 | Detail |
| 0391/04/2025 | 002/SPP-PDAM/TU/IV/2025 | PERMOHONAN PEMBAYARAN | CV TIGA UTAMA | 2025-04-17 | 2025-04-30 | 756 | 3 | Detail |
| 0390/04/2025 | 008/SPP/PERUMDA-TOA/II/2025 | PERMOHONAN PEMBAYARAN | PT TUNAS OKTA AERO | 2025-04-04 | 2025-04-30 | 755 | 4 | Detail |
| 0389/04/2025 | 118/01/S07-3/PERUMDA-TB/Bks/IV/2025 | Ajuan Biaya Pekerjaan Pencabutan Periode MEI 2024-DESEMBER 2024 (294 SL) | S07 | 2025-04-16 | 2025-04-30 | 0249/04 | 3 | Detail |
| 0388/04/2025 | 104/01/S25/PERUMDA-TB/Bks/IV/2025 | Ajuan Biaya Pekerjaan Pencabutan | S25 | 2025-04-15 | 2025-04-30 | 0248/04 | 3 | Detail |
| 0387/04/2025 | 0094/AGA.04.01/F02020600/2025 | SURAT PEMBERITAHUAN PENDATAAN NIB | PLN ULP PRIMA BEKASI | 2025-04-14 | 2025-04-30 | 754 | 3 | Detail |
| 0386/04/2025 | 162/PH/KU-e/11.PD-16/KAMMI/IV/2025 | PERMOHONAN BANTUAN DANA | KAMMI KABUPATEN BEKASI | 2025-04-28 | 2025-04-30 | 753 | 3 | Detail |
| 0385/04/2025 | 030/B/SMPIT-JLC/as-syifa/IV/2025 | PERMOHONAN BANTUAN DANA/SPONSORSHIP ASFERA SMP 2025 | SMPIT AS-SYIFA BOARDING SCHOOL | 2025-04-19 | 2025-04-30 | 752 | 3 | Detail |
| 0384/04/2025 | SL-012/PMK/UPM/IV/2025 | SURAT PENGANTAR PROPOSAL PEMBERDAYAAN SOSIAL | UNIVERSITAS PARAMADINA | 2025-04-25 | 2025-04-30 | 751 | 3 | Detail |
| 0383/04/2025 | 13/BAPOR/PERUMDA-TB/BKS/IV/2025 | PERMOHONAN DISPENSASI ATLIT VOLI | BAPOR | 2025-04-28 | 2025-04-30 | 750 | 3 | Detail |
| 0382/04/2025 | 16.03/DU-CCT/SU/IV/2025 | PERMOHONAN INFORMASI KETERSEDIAAN PIPA DISTRIBUSI UMUM UNTUK DISTRIBUSI AIR BERSIH | PT CIMANGGIS CIBITUNG TOLLWAYS | 2025-04-16 | 2025-04-30 | 749 | 4 | Detail |
| 0381/04/2025 | XXX | PERTANGGUNG JAWABAN PEMAKAIAN IMPRES FUND BULAN APRIL 2025 (KE-II) | P01 | 2025-04-30 | 2025-04-30 | 0247/04 | 3 | Detail |
| 0380/04/2025 | 330/01/S08-2/PERUMDA-TB/Bks/IV/2025 | Usulan Penghapusan SPK Pasang Baru | S08 | 2025-04-17 | 2025-04-30 | 0246/04 | 3 | Detail |
| 0379/04/2025 | 123/Lap-Int/Im/IV/2025 | LAPORAN SANKSI ADMINISTRATIF IZIN PENGUSAHAAN SUMBER DAYA AIR | P01 | 2025-04-29 | 2025-04-29 | 0245/04 | 3 | Detail |
| 0378/04/2025 | 001/SPP-PDAM/TU/IV/2025 | PERMOHONAN PEMBAYARAN | CV.TIGA UTAMA | 2025-04-17 | 2025-04-29 | 748 | 3 | Detail |
| 0377/04/2025 | 067/01/S29/PERUMDA-TB/Bks/IV/2025 | Usulan biaya lemburan dan kelebihan jam kerja | S29 | 2025-03-29 | 2025-04-29 | 0244/04 | 4 | Detail |
| 0376/04/2025 | 34/Us/Prod/PERUMDA-TB/Bks/IV/2025 | USULAN BIAYA OPERASIONAL SAMPLING LABORATORIUM FEBRUARI 2025 | P07 | 2025-04-29 | 2025-04-29 | 0243/04 | 3 | Detail |
| 0375/04/2025 | 12/TIM-EK/PERUMDA-TB/Bks/IV/2025 | LAPORAN HASIL EVALUASI KEHILANGAN AIR KCP TAMBUN UTARA | P09 | 2025-04-29 | 2025-04-29 | 0242/04 | 3 | Detail |
| 0374/04/2025 | 119/01/S07-1/PERUMDA-TB/Bks/IV/2025 | Usulan Kelebihan Jam Kerja Maret - April 2025 | S07 | 2025-04-21 | 2025-04-29 | 0241/04 | 3 | Detail |
| 0373/04/2025 | 028/02/S31-3/PERUMDA-TB/Bks/IV/2025 | Pemberitahuan Perbaikan Kebocoran | S31 | 2025-04-28 | 2025-04-29 | 0240/04 | 3 | Detail |
| 0372/04/2025 | 026/01/S23/PERUMDA-TB/Bks/IV/2025 | USULAN LEMBUR PELAKSANA IPA DAN SATUAN KEAMANAN | S23 | 2025-04-29 | 2025-04-29 | 0239/04 | 3 | Detail |
| 0371/04/2025 | 41/KEU/04/Perumda-TB/Bks/IV/2025 | BIAYA PENGGANTIAN RTGS | P02 | 2025-04-29 | 2025-04-29 | 0238/04 | 3 | Detail |
| 0370/04/2025 | 40/KEU/PERUMDA/Bks/IV/2025 | BIAYA OPERASIONAL REVIUW LAPORAN ADMINISTRASI KEUANGAN TRIWULAN I TAHUN 2025 | P02 | 2025-04-29 | 2025-04-29 | 0237/04 | 3 | Detail |
| 0369/04/2025 | 39/KEU/PERUMDA/Bks/IV/2025 | PEMBAYARAN PELUNASAN AIR CURAH PT BINTANG TIRTA SEJAHTERA PERIODE JANUARI 2025 | P02 | 2025-04-29 | 2025-04-29 | 0236/04 | 3 | Detail |
| 0368/04/2025 | 38/KEU/PERUMDA/Bks/IV/2025 | PEMBAYARAN PELUNASAN AIR CURAH PT. GRENEX TIRTA INDONESIA PERIODE JANUARI 2025 | P02 | 2025-04-29 | 2025-04-29 | 0235/04 | 3 | Detail |
| 0367/04/2025 | 37/KEU/PERUMDA/Bks/IV/2025 | PEMBAYARAN CICILAN KE-3 AIR CURAH PT MOYA BEKASI JAYA PERIODE NOVEMBER 2024 | P02 | 2025-04-29 | 2025-04-29 | 0234/04 | 3 | Detail |
| 0366/04/2025 | 36/KEU/PERUMDA/Bks/IV/2025 | PEMBAYARAN (ANGSURAN KE-9) PT TIGALAPAN ADAM INTERNASIONAL | P02 | 2025-04-29 | 2025-04-29 | 0233/04 | 3 | Detail |
| 0365/04/2025 | 35/KEU/PERUMDA/Bks/IV/2025 | PEMBAYARAN CICILAN AIR CURAH JABABEKA TAHAP 8 PERIODE APRIL-JUNI 2024 | P02 | 2025-04-29 | 2025-04-29 | 0232/04 | 3 | Detail |
| 0364/04/2025 | 34/KEU/PERUMDA/Bks/IV/2025 | PEMBAUARAN CICILAN KEWAJIBAN PAD KEPADA PEMERINTAH KABUPATEN BEKASI TAHUN AUDIT 2021 | P02 | 2025-04-24 | 2025-04-29 | 0231/04 | 3 | Detail |
| 0363/04/2025 | 003/WPB-AR/PDAM/III/2025 | TAGIHAN REKENING AIR BULAN MARET 2025 | PT WATERINDO PRIMATECH BEKASI | 2025-03-27 | 2025-04-29 | 747 | 3 | Detail |
| 0362/04/2025 | 002/WPB-AR/PDAM/II/2025 | TAGIHAN REKENING AIR BULAN FEBRUARI 2025 | PT WATERINDO PRIMATECH BEKASI | 2025-02-27 | 2025-04-29 | 746 | 4 | Detail |
| 0361/04/2025 | 011-SRT/WPB/III/2025 | PENAGIHAN KEKURANGAN PEMBAYARAN | PT WATERINDO PRIMATECH BEKASI | 2025-03-27 | 2025-04-29 | 745 | 3 | Detail |
| 0360/04/2025 | 003-SRT/WPB/II/2025 | PENAGIHAN KEKURANGAN PEMBAYARAN | PT WATERINDO PRIMATECH BEKASI | 2025-02-27 | 2025-04-29 | 744 | 3 | Detail |
| 0359/04/2025 | 440/3276/Lab Kesda | USULAN PEMBAYARAN PEMERIKSAAN PERIODE BULAN MARET 2025 | DINAS KESEHATAN KOTA BEKASI | 2025-03-24 | 2025-04-29 | 743 | 3 | Detail |
| 0358/04/2025 | 440/2069/Lab Kesda | USULAN PEMBAYARAN PEMERIKSAAN PERIODE BULAN FEBRUARI 2025 | DINAS KESEHATAN KOTA BEKASI | 2025-02-24 | 2025-04-29 | 742 | 3 | Detail |
| 0357/04/2025 | 440/1053/Lab Kesda | USULAN PEMBAYARAN PEMERIKSAAN PERIODE JANUARI 2025 | DINAS KESEHATAN KOTA BEKASI | 2025-01-30 | 2025-04-29 | 741 | 3 | Detail |
| 0356/04/2025 | 440/14430/Lab.Kesda | USULAN PEMBAYARAN PEMERIKSAAN PERIODE BULAN DESEMBER 2024 | DINAS KESEHATAN KOTA BEKASI | 2024-12-31 | 2025-04-29 | 740 | 3 | Detail |
| 0355/04/2025 | 124/01/S09-2/PERUMDA-TB/Bks/IV/2025 | Usulan Penempatan Tugas Karyawan | S09 | 2025-04-28 | 2025-04-29 | 0230/04 | 3 | Detail |
| 0354/04/2025 | 122/01/S09-2/PERUMDA-TB/Bks/IV/2025 | Pengembalian Uang Rekening | S09 | 2025-04-25 | 2025-04-29 | 0229/04 | 3 | Detail |
| 0353/04/2025 | 400.14.5.3/3816/Rek/2025 | UNDANGAN | SEKRETARIAT DAERAH KAB BEKASI | 2025-04-28 | 2025-04-29 | 739 | 5 | Detail |
| 0352/04/2025 | B-263/Ah.10/HJ.06/04/2025 | PERMOHONAN TIDAK ADA GANGGUAN DISTRIBUSI AIR | KEMENTERIAN AGAMA RI | 2025-04-22 | 2025-04-29 | 738 | 3 | Detail |
| 0351/04/2025 | 004/GPI/DIR-SKE/IV/2025 | PERMOHONAN PERBAIKAN KEBOCORAN PIPA HDPE DIAMETER 500 MM DI DEPAN PERUMAHAN VILA GADING HARAPAN BABELAN | PT GRENEX PERKASA INDONESIA | 2025-04-25 | 2025-04-29 | 737 | 3 | Detail |
+ Tambah Surat Baru (INSERT tm_surat)
Backup data sebelumnya?