Pencarian Surat
Hasil (50 surat, halaman 365)
| Index Surat | Nomor Surat | Perihal | Asal Surat | Tgl Surat | Tgl Terima | No. Agenda | Dispos | |
|---|---|---|---|---|---|---|---|---|
| 0445/11/2023 | XXX | PERTANGGUNG JAWABAN PEMAKAIAN IMPRES FUND BULAN NOVEMBER 2023 (KE-II) | P01 | 2023-11-24 | 2023-11-24 | 0227/11 | 1 | Detail |
| 0444/11/2023 | PU.01.01/3012/DSDABMBK/2023 | PEMBERITAHUAN | DSDABMBK | 2023-11-23 | 2023-11-23 | 2758 | 3 | Detail |
| 0443/11/2023 | 10/SP/PDAM-TB/KCP.KDW/XI/2023 | TEGURAN PERTAMA PEKERJAAN GALIAN PEMASANGAN PIPA HDPE MILIK PDAM TIRTA BHAGASASI DI RUAS JALAN NASIONAL BTS | S23 | 2023-11-22 | 2023-11-23 | 0226/11 | 3 | Detail |
| 0442/11/2023 | 09/Us.Keam/PDAM-TB/Bks/XI/2023 | USULAN LEMBUR KEAMANAN/SEKURITI | S23 | 2023-11-21 | 2023-11-23 | 0225/11 | 3 | Detail |
| 0441/11/2023 | 08/Us.Prod/PDAM-TB/Bks/XI/2023 | USULAN LEMBUR OPERATOR | S23 | 2023-11-21 | 2023-11-23 | 0224/11 | 3 | Detail |
| 0440/11/2023 | 226/Usl/Cab.PondokUngu/XI/2023 | USULAN KELEBIHAN JAM KERJA | S07 | 2023-11-21 | 2023-11-23 | 0223/11 | 3 | Detail |
| 0439/11/2023 | XXX | PENGAJUAN PENGGANTIAN SALURAN PIPA PDAM | HERI SUMARNA (PGW) | 2023-09-04 | 2023-11-23 | 2757 | 3 | Detail |
| 0438/11/2023 | 038/SPP/PDAM-TOA/X/2023 | PERMOHONAN PEMBAYARAN | PT TUNAS OKTA AERO | 2023-11-22 | 2023-11-23 | 2756 | 3 | Detail |
| 0437/11/2023 | 04/US-WGM/KCP.TU/Bks/XI/2023 | USULAN PENGGANTIAN WATER METER PELANGGAN | S25 | 2023-11-20 | 2023-11-23 | 0222/11 | 3 | Detail |
| 0436/11/2023 | 04/Usl/Hublang/Cab.PondokUngu/XI/2023 | USULAN PENGGANTIAN WATER METER PELANGGAN CABANG PONDOK UNGU | S07 | 2023-11-22 | 2023-11-23 | 0221/11 | 3 | Detail |
| 0435/11/2023 | 07/Us/KCP.Tambelang/PDAM/BKS/XI/2023 | USULAN LEMBUR KELEBIHAN JAM KERJA PERIODE OKTOBER - NOVEMBER 2023 | S24 | 2023-11-20 | 2023-11-23 | 0220/11 | 3 | Detail |
| 0434/11/2023 | 068/OP.TK/Cab.Cbr/PDAM/XI/2023 | USULAN BIAYA PENGGANTIAN WATER METER (WM) | S22 | 2023-11-20 | 2023-11-23 | 0219/11 | 3 | Detail |
| 0433/11/2023 | 067/OP.TK/Cab.Cbr/PDAM/XI/2023 | USULAN BIAYA PEMASANGAN SL BARU | S22 | 2023-11-20 | 2023-11-23 | 0218/11 | 3 | Detail |
| 0432/11/2023 | 063/OP.TK/Cab.Cbr/PDAM/XI/2023 | USULAN BIAYA PENYAMBUNGAN KEMBALI (PK) | S22 | 2023-11-20 | 2023-11-23 | 0217/11 | 3 | Detail |
| 0431/11/2023 | 63/BAG.TI/PDAM-TB/BKS/XI/2023 | PERBAIKAN (MAINTENANCE) TOWER JARINGAN KCP KEDUNGWARINGIN | P12 | 2023-11-23 | 2023-11-23 | 0216/11 | 3 | Detail |
| 0430/11/2023 | 32/PDK/PDAM/Bks/XI/2023 | KEBUTUHAN DATA DAN PENDAMPINGAN | P18 | 2023-11-23 | 2023-11-23 | 0215/11 | 4 | Detail |
| 0429/11/2023 | 132/US/TK/Cab.TraumaJaya/BKS/XI/2023 | USULAN BIAYA PERBAIKAN KEBOCORAN PIPA DIA. 3" DAN DIA.; 4" | S06 | 2023-11-23 | 2023-11-23 | 0214/11 | 3 | Detail |
| 0428/11/2023 | 100/Usl.Tk/BOCBT/Cab.LA/PDAM-TB/Bks/XI/2023 | USULAN BIAYA OPERASIONAL PENCABUTAN SL | S20 | 2023-11-21 | 2023-11-23 | 0213/11 | 3 | Detail |
| 0427/11/2023 | 86/Usl-TK/PDAM/Cikut/Bks/XI/2023 | USULAN RAB KEBOCORAN PIPA DIA. 8" | S04 | 2023-11-22 | 2023-11-23 | 0212/11 | 3 | Detail |
| 0426/11/2023 | 87/Usl-TK/PDAM/Cikut/Bks/XI/2023 | USULAN RAB KEBOCORAN PIPA DIA. 20", JL.RAYA INDUSTRI TEGAL GEDE RT.09/03, SEBELUM PINTU JABABEKA I | S04 | 2023-11-19 | 2023-11-23 | 0211/11 | 3 | Detail |
| 0425/11/2023 | 132/Us.Int/PDAM-TB/Bks/XI/2023 | PERMOHONAN MAINTENANCE TANGKI SOLAR, PEMBELIAN SOLAR DAN SERVIS GENSET | P01 | 2023-11-22 | 2023-11-23 | 0210/11 | 3 | Detail |
| 0424/11/2023 | 62/HWDI/10/2023 | PERMOHONAN BANTUAN BAHAN PANGAN DAN ALAT PENUNJANG KERJA DISABILITAS DALAM RANGKA HARI DISABILITAS INTERNASIONAL (HDI) | HWDI KOTA BEKASI | 2023-10-24 | 2023-11-23 | 2755 | 3 | Detail |
| 0423/11/2023 | 1434/MSA/XI/2023 | PERMOHONAN PEMASANGAN JARINGAN PDAM | PT MALAIKA SANTARA ABADI | 2023-11-22 | 2023-11-23 | 2754 | 3 | Detail |
| 0422/11/2023 | XXX | REKAPITULASI GAJI MANUAL PDAM TIRTA BHAGASASI BEKASI BULAN NOVEMBER 2023 | P13 | 2023-11-23 | 2023-11-23 | 0209/11 | 1 | Detail |
| 0421/11/2023 | XXX | REKAPITULASI GAJI DIREKSI, DEWAN PENGAWAS, PEGAWAI DAN HARIAN LEPAS PDAM TIRTA BHAGASASI BULAN NOVEMBER 2023 | P13 | 2023-11-23 | 2023-11-23 | 0208/11 | 1 | Detail |
| 0420/11/2023 | 005/7865/Setda.Ek | UNDANGAN | WALI KOTA BEKASI | 2023-11-22 | 2023-11-23 | 2753 | 3 | Detail |
| 0419/11/2023 | 005/7850/Setda.Ek | UNDANGAN | SEKRETARIAT DAERAH KOTA BEKASI | 2023-11-22 | 2023-11-22 | 2752 | 3 | Detail |
| 0418/11/2023 | 55/BAPOR/PDAM-TB/BKS/XI/2023 | PERMOHONAN DISPENSASI | BAPOR | 2023-11-22 | 2023-11-22 | 2751 | 3 | Detail |
| 0417/11/2023 | 12.11/JMI/XI/2023 | PERMOHONAN IZIN PENGUKURAN FLOW PIPA A,B,C | PT.JUAN MULIA INDONESIA | 2023-11-22 | 2023-11-22 | 2750 | 3 | Detail |
| 0416/11/2023 | 112/S-Kel/DIR/RSBM/XI/2023 | PERMOHONAN PENDAFTARAN SAMBUNGAN LANGGANAN | RS.BUNDA MULIA | 2023-11-01 | 2023-11-22 | 2749 | 3 | Detail |
| 0415/11/2023 | 001/SPP-PDAM/ALT/XI/2023 | PERMOHONAN PEMBAYARAN | CV.ALTAMIS | 2023-11-09 | 2023-11-22 | 2748 | 3 | Detail |
| 0414/11/2023 | 006/PQ/FIMA/XI/2023 | PERMOHONAN PEMBAYARAN | PT.FAJAR JAYA MITRA ABADI | 2023-11-15 | 2023-11-22 | 2747 | 3 | Detail |
| 0413/11/2023 | 059/SPP/PDAM-BKS/NIC/XI/23 | PERMOHONAN PEMBAYARAN | PT.NUSA INTI CEMERLANG | 2023-11-22 | 2023-11-22 | 2746 | 3 | Detail |
| 0412/11/2023 | 147/SPA-SK/XI/23 | PERMOHONAN PEMBAYARAN | PT.SUNGAIPANJANG ADAMAS | 2023-11-11 | 2023-11-22 | 2745 | 3 | Detail |
| 0411/11/2023 | 017/P.HUT42/PDAM-TB/BKS/XI/2023 | PENGAJUAN PEMBIAYAAN HUT KE-42 TAHAP KE-2 | PANITIA HUT KE 42 PDAM TB | 2023-11-21 | 2023-11-22 | 2744 | 3 | Detail |
| 0410/11/2023 | 131/Us.Int/Um/XI/2023 | USULAN PENGADAAN KENDARAAN OPERASIONAL PDAM TIRTA BHAGASASI | P01 | 2023-11-22 | 2023-11-22 | 0207/11 | 3 | Detail |
| 0409/11/2023 | 252/Us.Peg/PDAM-TB/XI/2023 | USULAN KENAIKAN GAJIAN BERKALA | P13 | 2023-11-22 | 2023-11-22 | 0206/11 | 3 | Detail |
| 0408/11/2023 | 08/Ext/Simpin/Kopkar-TM/XI/2023 | PERMOHONAN TINDAK LANJUT TERKAIT DANA ENDAPAN YANG DI PAKAI OLEH PENGURUS KOPERASI PERIODE TAHUN 2019-2020 | KOPERASI KARYAWAN TIRTA MUKTI | 2023-11-21 | 2023-11-22 | 2743 | 4 | Detail |
| 0407/11/2023 | 584/KU.03.02/PAP | SURAT KETETAPAN PAJAK DAERAH (SKPD) PAJAK AIR PERMUKAAN | BAPENDA PROVINSI JAWA BARAT | 2023-11-20 | 2023-11-22 | 2742 | 3 | Detail |
| 0406/11/2023 | MBJ/OPR/MBJ/23.11/107 | PERMINTAAN PENYIAPAN MATERIAL PERBAIKAN JDU SELATAN B AREA SAWAH | PT MOYA BEKASI JAYA | 2023-11-21 | 2023-11-22 | 2741 | 3 | Detail |
| 0405/11/2023 | HM.01.02/1791-DPRD/2023 | KUNJUNGAN LAPANGAN PANITIA KHUSUS 27 DPRD KABUPATEN BEKASI | DPRD KAB.BEKASI | 2023-11-17 | 2023-11-22 | 2740 | 3 | Detail |
| 0404/11/2023 | XXX | PEMBAYARAN HONOR BULAN OKTOBER 2023 | D04 | 2023-11-16 | 2023-11-22 | 0205/11 | 3 | Detail |
| 0403/11/2023 | 107/Us/Prod/PDAM-Bks/XI/2023 | PERMOHONAN PEMBAYARAN | P07 | 2023-11-22 | 2023-11-22 | 0204/11 | 3 | Detail |
| 0402/11/2023 | 031/MGC/AD/SP/XI/2023 | SOSIALISASI PEMASANGAN PDAM | PT.ISPI PRATAMALESTARI PERKASA | 2023-11-22 | 2023-11-22 | 2739 | 3 | Detail |
| 0401/11/2023 | 022/BAL/11.2023 | PERMOHONAN PEMASANGAN PDAM | PT.BARUNA ANUGERAH LESTARI | 2023-11-15 | 2023-11-22 | 2738 | 3 | Detail |
| 0400/11/2023 | 120/SPI/PDAM.TB/BKS/XI/2023 | OPNAME PERSEDIAAN BARANG BAG.KEUANGAN, BAG.UMUM, BAG.PRODUKSI, BAG.IT DAN BAG.ME PDAM TIRTA BHAGASASI | P08 | 2023-11-22 | 2023-11-22 | 0203/11 | 3 | Detail |
| 0399/11/2023 | XXX | HONOR TIM PENYUSUNAN RENCANA KERJA ANGGARAN PERUSAHAAN PERUMDA TIRTA BHAGASASI BEKASI TAHUN 2024 | P02 | 2023-11-22 | 2023-11-22 | 0202/11 | 3 | Detail |
| 0398/11/2023 | SM.06-Ca/587 | UNDANGAN PELAKSANAAN MONITORING DAN EVALUASI PASCA BIMBINGAN TEKNIS BIDANG AIR MINUM | KEMEN PUPR DIRJEN CIPTA KARYA | 2023-11-21 | 2023-11-22 | 2737 | 3 | Detail |
| 0397/11/2023 | 44/Usl.Dist/PDAM-BKS/XI/2023 | LAPORAN UNDANGAN SIAGA BENCANA HIDROMETEOROLOGI | P04 | 2023-11-22 | 2023-11-22 | 0201/11 | 3 | Detail |
| 0396/11/2023 | 54/BAPOR/ANGG/PDAM-TB/BKS/XI/2023 | PERMOHONAN BIAYA TC (TEHNIKAL CENTER) JOGJA DAN FINAL FOUR KEDIRI DIVISI UTAMA 2023 | BAPOR | 2023-11-21 | 2023-11-22 | 2736 | 3 | Detail |
+ Tambah Surat Baru (INSERT tm_surat)
Backup data sebelumnya?