Pencarian Surat
Hasil (50 surat, halaman 257)
| Index Surat | Nomor Surat | Perihal | Asal Surat | Tgl Surat | Tgl Terima | No. Agenda | Dispos | |
|---|---|---|---|---|---|---|---|---|
| 0382/09/2024 | B.057 A/MTA/Dir/VIII/2024 | PERMOHONAN PHO | PT MITRA TIRTA ASIA | 2024-08-21 | 2024-09-24 | 2017 | 3 | Detail |
| 0381/09/2024 | 15/UP | PERMOHONAN PEMBAYARAN OPERASIONAL PENDAMPINGAN PERKARA NOMER 74/G/2024/PTUN-BDG DI PTUN BANDUNG | UP DAN PARTNERS | 2024-09-24 | 2024-09-24 | 2016 | 3 | Detail |
| 0380/09/2024 | XXX | PERMOHONAN PENYAMBUNGAN KEMBALI PDAM | Drs. OSMAN SIREGAR | 2024-09-18 | 2024-09-24 | 2015 | 3 | Detail |
| 0379/09/2024 | 002/GPI/DIR-SKE/IX/2024 | PERMINTAAN KEDUA UNTUK PEMBAYARAN TAGIHAN PENJUALAN AIR CURAH OLAHAN | PT GRENEX PERKASA INDONESIA | 2024-09-20 | 2024-09-24 | 2014 | 3 | Detail |
| 0378/09/2024 | XXX | PERMOHONAN PENAWARAN HARGA | GRAND SURI HOTELS | 2024-09-24 | 2024-09-24 | 2013 | 3 | Detail |
| 0377/09/2024 | 117/SPI/PERUMDA-TB/Bks/IX/2024 | EVALUASI KINERJA KCP TAMBELANG | P08 | 2024-09-24 | 2024-09-24 | 0217/09 | 3 | Detail |
| 0376/09/2024 | 113/01/S20-3/PERUMDA-TB/Bks/IX/2024 | Permohonan Pengadaan dan Penggantian Pipa Distribusi dia. 2 INCH di Jl. Urip Sumohardjo/Kp. Walahir | S20 | 2024-09-23 | 2024-09-24 | 0216/09 | 3 | Detail |
| 0375/09/2024 | 045/01/S11/PERUMDA-TB/Bks/IX/2024 | Usulan perbaikan kebocoran pipa JDU HDPE 12 inch dan pemasangan Blind Flange di Tee Y 12 Inch ke 8 Inch tanjakan jekrem | S11 | 2024-09-23 | 2024-09-24 | 0215/09 | 3 | Detail |
| 0374/09/2024 | 046/01/S11/PERUMDA-TB/Bks/IX/2024 | Laporan usulan perbaikan pompa distribusi IPA Kerucut Kap.25 l/d | S11 | 2024-09-23 | 2024-09-24 | 0214/09 | 3 | Detail |
| 0373/09/2024 | 056/01/S04-3/PERUMDA-TB/Bks/IX/2024 | USULAN RAB PENGURUGAN DAN KOMPENSASI KEBOCORAN PIPA DIA. 20 INCH JL. TEGAL GEDE | S04 | 2024-09-16 | 2024-09-24 | 0213/09 | 3 | Detail |
| 0372/09/2024 | 055/01/S04-3/PERUMDA-TB/Bks/IX/2024 | USULAN RAB KEBOCORAN PIPA DIA. 20 INCH JL. TEGAL GEDE | S04 | 2024-09-16 | 2024-09-24 | 0212/09 | 3 | Detail |
| 0371/09/2024 | 054/01/S04-3/PERUMDA-TB/Bks/IX/2024 | USULAN PENGGANTIAN CHECK VALVE DIA. 06 INCH POMPA BOOSTER | S04 | 2024-09-23 | 2024-09-24 | 0211/09 | 3 | Detail |
| 0370/09/2024 | 053/01/S04-3/PERUMDA-TB/Bks/IX/2024 | USULAN PERBAIKAN POMPA BOOSTER | S04 | 2024-09-15 | 2024-09-24 | 0210/09 | 3 | Detail |
| 0369/09/2024 | 45/PEMAS/PERUMDA-TB/BKS/IX/2024 | PERMOHONAN PEMBUATAN RAB SL WM BESAR UNTUK KEBUTUHAN SK | P15 | 2024-09-24 | 2024-09-24 | 0209/09 | 3 | Detail |
| 0368/09/2024 | 140/01/S02-3/PERUMDA-TB/Bks/IX/2024 | Usulan Pembuatan RAB Untuk Pekerjaan Relokasi Pipa 4 INCH di Jl. KH. Noer Ali (Depan Hotel Amaris) | S02 | 2024-09-13 | 2024-09-24 | 0208/09 | 3 | Detail |
| 0367/09/2024 | 78/KEU/PERUMDA-TB/BKS/IX/2024 | PEMBAYARAN CICILAN SP2DK TAHUN 2021 | P02 | 2024-09-24 | 2024-09-24 | 0207/09 | 3 | Detail |
| 0366/09/2024 | 81/P-PEM/GU/PDAM-BKS | PERMOHONAN PEMBAYARAN PEKERJAAN PENGADAAN BAHAN DAN PEMASANGAN JARINGAN PERPIPAAN (SL) DIA 2" PERUM ZIA EMERALD | CV GAZA UTAMA | 2024-09-23 | 2024-09-24 | 2012 | 3 | Detail |
| 0365/09/2024 | XXX | REKAPITULASI GAJI MANUAL PERUMDA TIRTA BHAGASASI BEKASI BULAN SEPT 2024 | P13 | 2024-09-24 | 2024-09-24 | 0206/09 | 1 | Detail |
| 0364/09/2024 | XXX | REKAPITULASI DIREKSI, DEWAN PENGAWAS, PEGAWAI DAN HARIAN LEPAS BULAN SEPTEMBER 2024 | P13 | 2024-09-24 | 2024-09-24 | 0205/09 | 1 | Detail |
| 0363/09/2024 | 069/01/S28-2/PERUMDA-TB/Bks/IX/2024 | PERBAIKAN PAGAR WTP (BELAKANG RUANG LOKET) | S28 | 2024-09-20 | 2024-09-24 | 0204/09 | 4 | Detail |
| 0362/09/2024 | 134/01/S02-4/PERUMDA-TB/Bks/IX/2024 | Usulan Penggantian Jaringan Pompa Dosing | S02 | 2024-09-19 | 2024-09-24 | 0203/09 | 3 | Detail |
| 0361/09/2024 | UM.0102-Ca/619 | UNDANGAN RAPAT PEMBAHASAN PERSIAPAN COMMERCIAL OPERATION DATE (COD) SPAM REGIONAL JATILUHUR I | KEMEN PUPR DIRJEN CIPTA KARYA | 2024-09-23 | 2024-09-24 | 2011 | 3 | Detail |
| 0360/09/2024 | 05.30/HGN/IX/2024 | TAGIHAN PT HGN KEPADA PERUMDA TIRTA BHAGASASI YANG SUDAH JATUH TEMPO | PT HANIL GRENEX NETWORK | 2024-09-18 | 2024-09-23 | 2010 | 3 | Detail |
| 0359/09/2024 | 05.29/JMI/IX/2024 | TAGIHAN PT JMI KEPADA PERUMDA TIRTA BHAGASASI YANG SUDAH JATUH TEMPO | PT JUAN MULIA INDONESIA | 2024-09-18 | 2024-09-23 | 2009 | 2 | Detail |
| 0358/09/2024 | 05.21/GTI/IX/2024 | TAGIHAN PT GTI KEPADA PERUMDA TIRTA BHAGASASI-PIPA JDU YANG SUDAH JATUH TEMPO | PT GRENEX TIRTA INDONESIA | 2024-09-18 | 2024-09-23 | 2008 | 3 | Detail |
| 0357/09/2024 | XXX | PROGRES PEKERJAAN BULANAN PERIODE JULI 2024 - AGUSTUS 2024 | D04 | 2024-09-23 | 2024-09-23 | 0202/09 | 4 | Detail |
| 0356/09/2024 | LH.01.01/7503/DLH/2024 | UNDANGAN FOCUS GROUP DISCUSSION (FGD) KE 2 PENYUSUNAN DIKPLHD KABUPATEN BEKASI | SEKRETARIAT DAERAH KAB BEKASI | 2024-09-20 | 2024-09-23 | 2007 | 2 | Detail |
| 0355/09/2024 | 111/SMK.0174/HUBIN/IX/2024 | PERMOHONAN SISWA PSG/PKL | SMK TIARA BANGSA | 2024-09-23 | 2024-09-23 | 2006 | 3 | Detail |
| 0354/09/2024 | 04/PPHPBJ/PERUMDA-TB/IX/2024 | USULAN BIAYA KUNJUNGAN PEMERIKSAAN KE LAPANGAN | P04 | 2024-09-20 | 2024-09-23 | 0201/09 | 3 | Detail |
| 0353/09/2024 | 03/PPHPBJ/PERUMDA-TB/IX/2024 | USULAN HONOR KEGIATAN | P04 | 2024-09-20 | 2024-09-23 | 0200/09 | 3 | Detail |
| 0352/09/2024 | 053/MKI/IX/2024 | SURAT KETERANGAN KETERSEDIAAN/KETIDAKTERSEDIAAN PERUSAHAAN DAERAH AIR MINUM TIRTA BHAGASASI BEKASI | PT MULTIKIMIA INTIPELANGI | 2024-09-23 | 2024-09-23 | 2005 | 3 | Detail |
| 0351/09/2024 | 01/GPKB/IV/2024 | PERMOHONAN BANTUAN DANA | GERAKAN PEMUDA KAB BEKASI | 2024-09-01 | 2024-09-23 | 2004 | 3 | Detail |
| 0350/09/2024 | PS 0403-Sb/1012 | PENDAMPINGAN PELAKSAAN INVENTARIS DAN VERIFIKASI FISIK HIBAH BMN (BMN) DENGAN KEMENTERIAN SEKRETARIAT NEGARA PADA BPPW | KEMEN PUPR SEKJEN | 2024-09-20 | 2024-09-23 | 2003 | 3 | Detail |
| 0349/09/2024 | 900.1.13.2/4775/Setda.Ek | UNDANGAN | SEKRETARIAT DAERAH KOTA BEKASI | 2024-09-09 | 2024-09-20 | 2002 | 3 | Detail |
| 0348/09/2024 | 040/01/S23/PERUMDA-TB/Bks/IX/2024 | USULAN PENYAMPAIAN INFORMASI UNTUK MENGGUNAKAN AIR PERMUKAAN | S23 | 2024-09-20 | 2024-09-20 | 0199/09 | 3 | Detail |
| 0347/09/2024 | 039/01/S23/PERUMDA-TB/Bks/IX/2024 | USULAN PERBAIKAN KEBOCORAN JARINGAN PIPA PVC JDU DIA 300 MM | S23 | 2024-09-19 | 2024-09-20 | 0198/09 | 3 | Detail |
| 0346/09/2024 | 15/Usln/Hbl.Pst/PERUMDA.TB/IX/2024 | USULAN KEKURANGAN PEMBAYARAN COKLIT PERIODE BULAN JUNI DAN JULI 2024 | P03 | 2024-09-20 | 2024-09-20 | 0197/09 | 3 | Detail |
| 0345/09/2024 | 174/Us.Peg/PERUMDA-TB/Bks/IX/2024 | USULAN PENGADAAN PAKAIAN SERAGAM PDH | P13 | 2024-09-19 | 2024-09-20 | 0196/09 | 3 | Detail |
| 0344/09/2024 | 107/01/S20-3/PERUMDA-TB/Bks/IX/2024 | Permohonan Biaya Pemasangan Penambahan Debit dan Pressure di Perum. Graha Asri Jl. Cipaganti | S20 | 2024-09-13 | 2024-09-20 | 0195/09 | 3 | Detail |
| 0343/09/2024 | XXX | PERMOHONAN OPEN TABLE DI GEDUNG PERUMDA TIRTA BHAGSASI | TRANS PROPERTY | 2024-09-19 | 2024-09-20 | 2001 | 3 | Detail |
| 0342/09/2024 | 175/Int.Peg/PERUMDA-TB/IX/2024 | USULAN BIAYA PERSYARATAN UMROH | P13 | 2024-09-20 | 2024-09-20 | 0194/09 | 3 | Detail |
| 0341/09/2024 | 76/KEU/PDAM/bKS/IX/2024 | BIAYA OPERASIONAL REVIUW LAPORAN ADMINISTRASI TEKNIK TRIWULAN II TAHUN 2024 | P02 | 2024-09-20 | 2024-09-20 | 0193/09 | 3 | Detail |
| 0340/09/2024 | 77/KEU/PERUMDA/Bks/IX/2024 | BIAYA OPERASIONAL REVIUW LAPORAN KEUANGAN BULAN MEI DAN JUNI 2024 PERUMDA TIRTA BHAGASASI | P02 | 2024-09-20 | 2024-09-20 | 0192/09 | 3 | Detail |
| 0339/09/2024 | 038/01/S23/PERUMDA-TB/Bks/IX/2024 | Usulan Biaya Pekerjaan Pemasangan Butterfly Valve Over Flow Dia 4" Bak Filtrasi | S23 | 2024-09-06 | 2024-09-20 | 0191/09 | 3 | Detail |
| 0338/09/2024 | 077/01/S07-4/PERUMDA-TB/Bks/IX/2024 | Operasional Biaya Pekerjaan Penggantian Gate Valve Butterfly Dia 250mm IPA No. 03 | S07 | 2024-09-09 | 2024-09-20 | 0190/09 | 3 | Detail |
| 0337/09/2024 | 075/01/S07-3/PERUMDA-TB/Bks/IX/2024 | Operasional Biaya Pemasangan Sambungan Langganan (SL) Dia 1" Purnomo Sidhi, Jl.Harapan Indah Bulevar Sentra Niaga Blok S | S07 | 2024-09-09 | 2024-09-20 | 0189/09 | 3 | Detail |
| 0336/09/2024 | 091/01/S06-3/PERUMDA-TB/Bks/VIII/2024 | Usulan Biaya Pengadaan Bahan dan Perbaikan Kebocoran Pipa Distribusi Dia 400 MM Di Harapan Indah Blok P | S06 | 2024-08-14 | 2024-09-20 | 0188/09 | 3 | Detail |
| 0335/09/2024 | 037/01/S25/PERUMDA-TB/Bks/IX/2024 | Usulan Pekerjaan Kebocoran Pipa Dia 14 " Di Jl Raya Rawa Kalong | S25 | 2024-09-05 | 2024-09-20 | 0187/09 | 3 | Detail |
| 0334/09/2024 | 068/01/S28-3/PERUMDA-TB/Bks/IX/2024 | USULAN BIAYA OPERASIONAL PENCABUTAN METER PELANGGAN | S28 | 2024-09-19 | 2024-09-20 | 0186/09 | 3 | Detail |
| 0333/09/2024 | 067/01/S28-3/PERUMDA-TB/Bks/IX/2024 | USULAN BIAYA OPERASIONAL PENYAMBUNGAN KEMBALI LANGGANAN | S28 | 2024-09-19 | 2024-09-20 | 0185/09 | 3 | Detail |
+ Tambah Surat Baru (INSERT tm_surat)
Backup data sebelumnya?