Pencarian Surat
Hasil (50 surat, halaman 237)
| Index Surat | Nomor Surat | Perihal | Asal Surat | Tgl Surat | Tgl Terima | No. Agenda | Dispos | |
|---|---|---|---|---|---|---|---|---|
| 0356/11/2024 | XXX | JADWAL RENCANA PEMBAYARAN ANGSURAN PPh BADAN PASAL 25 TAHUN 2024 | P02 | 2024-02-07 | 2024-11-19 | 0201/11 | 1 | Detail |
| 0355/11/2024 | XXX | RINCIAN DAFTAR SISA TAGIHAN PAJAK TAHUN 2019 (PT PERUSAHAAN UMUM DAERAH TB (01.477.196.8-431.000) | P02 | 2024-11-19 | 2024-11-19 | 0200/11 | 1 | Detail |
| 0354/11/2024 | RT.04/1926-DPRD/2024 | UNDANGAN RAPAT KERJA | DPRD KAB BEKASI | 2024-11-19 | 2024-11-19 | 2432 | 3 | Detail |
| 0353/11/2024 | XXX | PROPOSAL | PT CAKRAWALA PERS MEDIA | 2024-09-25 | 2024-11-19 | 2431 | 3 | Detail |
| 0352/11/2024 | 009/PMM/SMG/SPP/XI/24 | SURAT PERMOHONAN PEMBAYARAN | PT PITULAS MOYA MANDIRI | 2024-11-08 | 2024-11-19 | 2430 | 3 | Detail |
| 0351/11/2024 | UM0102-Cb12/794 | UNDANGAN | KEMEN PUPR DIRJEN CIPTA KARYA | 2024-11-18 | 2024-11-19 | 2429 | 3 | Detail |
| 0350/11/2024 | KI.07.01/4000/Diskominfosantik.2/2024 | UNDANGAN PENERIMA PENGHARGAAN DIGITAL K0MUNIKASI FESTIVAL (DIGIKOM FEST) TAHUN 2024 | DISKOMINFOSANTIK KAB.BEKASI | 2024-11-15 | 2024-11-19 | 2428 | 3 | Detail |
| 0349/11/2024 | 05.26/GTI/XI/2024 | TAGIHAN PT GTI KEPADA PERUMDA TIRTA BHAGASASI-PIPA JDU YANG SUDAH JATUH TEMPO | PT GRENEX TIRTA INDONESIA | 2024-11-18 | 2024-11-19 | 2427 | 3 | Detail |
| 0348/11/2024 | 05.46/JMI/XI/I2024 | TAGIHAN PT JMI KEPADA PERUMDA TIRTA BHAGASASI YANG SUDAH JATUH TEMPO | PT JUAN MULIA INDONESIA | 2024-11-18 | 2024-11-19 | 2426 | 4 | Detail |
| 0347/11/2024 | 05.51/HGN/XI/2024 | TAGIHAN PT HGN KEPADA PERUMDA TIRTA BHAGASASI YANG SUDAH JATUH TEMPO | PT HANIL GRENEX NETWORK | 2024-11-18 | 2024-11-19 | 2425 | 3 | Detail |
| 0346/11/2024 | 003/FKP/XI/2024 | LANJUTAN PEMBAHASAN PENSIUNAN ANUITAS | FORUM KOMUNIKASI PENSIUNAN | 2024-11-18 | 2024-11-19 | 2424 | 3 | Detail |
| 0345/11/2024 | 053/01/S26-1/PERUMDA-TB/Bks/X/2024 | Permohonan Pembayaran Perbaikan Plat Penutup Saluran Drainase | S26 | 2024-10-18 | 2024-11-19 | 0199/11 | 3 | Detail |
| 0344/11/2024 | 6/TT/PERUMDA/TB/XI/2024 | PENGAJUAN HONOR KERJA TIM TEKNIS PERIODE NOVEMBER 2023 - OKTOBER 2024 | P05 | 2024-11-19 | 2024-11-19 | 0198/11 | 3 | Detail |
| 0343/11/2024 | 88/Keu-01/Perumda-TB/BKS/XI/2024 | PERMOHONAN PENERAPAN MANAJEMEN ASSET | P02 | 2024-11-19 | 2024-11-19 | 0197/11 | 3 | Detail |
| 0342/11/2024 | 87/Keu-01/Perumda-TB/BKS/XI/2024 | PERMOHONAN PENGGUNAAN JASA AKTUARIA TAHUN BUKU 2024 | P02 | 2024-11-19 | 2024-11-19 | 0196/11 | 3 | Detail |
| 0341/11/2024 | Kl.07.01/3999/Diskominfosantik.2/2024 | UNDANGAN DIGITAL KOMUNIKASI FESTIVAL 2024 | BUPATI BEKASI | 2024-11-15 | 2024-11-19 | 2423 | 3 | Detail |
| 0340/11/2024 | 032/SPP/PERUMDA-TOA/IX/2024 | PERMOHONAN PEMBAYARAN | PT.TUNAS OKTA AERO | 2024-11-15 | 2024-11-19 | 2422 | 3 | Detail |
| 0339/11/2024 | 240/Usl/Umum/GD/XI/2024 | USULAN PENGADAAN LOGISTIK GUDANG PERUMDA TIRTA BHAGASASI BULAN NOVEMBER 2024 | P01 | 2024-11-18 | 2024-11-19 | 0195/11 | 3 | Detail |
| 0338/11/2024 | 34/Hk-Lap/PERUMDA-TB/XI/2024 | PENDAPAT HUKUM | P17 | 2024-11-15 | 2024-11-18 | 0194/11 | 4 | Detail |
| 0337/11/2024 | 03/PBS/Pers-Minat/XI/2024 | SURAT PERMOHONAN INVESTASI KERJASAMA SAMBUNGAN LANGGANAN | CV.PUTRA BINTANG SAGA | 2024-11-15 | 2024-11-18 | 2421 | 3 | Detail |
| 0336/11/2024 | 003/BTS-PDAM/X/2024 | TAGIHAN REKENING AIR BULAN OKTOBER 2024 | PT.BINTANG TIRTA SEJAHTERA | 2024-10-28 | 2024-11-18 | 2420 | 3 | Detail |
| 0335/11/2024 | 189/01/S08-3/PERUMDA-TB/Bks/X/2024 | Usulan biaya pengadaan dan pemasangan bahan WM zoning DIA. 100 mm dan α΄160mm di Perumahan Bulak Kapai Permai | S08 | 2024-10-22 | 2024-11-18 | 0193/11 | 3 | Detail |
| 0334/11/2024 | 181/01/S08-3/PERUMDA-TB/Bks/X/2024 | Usulan Biaya Perbaikan Kebocoran Pipa Dia.400 MM di Perum Giandra Kampung Sasak Bakar Desa Hertamukti | S08 | 2024-10-14 | 2024-11-18 | 0192/11 | 3 | Detail |
| 0333/11/2024 | 159/01/S03-4/PERUMDA-TB/Bks/X/2024 | USULAN BIAYA PENGADAAN BAHAN DAN PERBAIKAN GATE VALVE BACKWASH INLATE Lokasi : INSTALASI PENGOLAHAN IPA K20 STM - CABANG | S03 | 2024-10-22 | 2024-11-18 | 0191/11 | 3 | Detail |
| 0332/11/2024 | 060/01/S24/PERUMDA-TB/Bks/IX/2024 | Pengajuan Biaya Pekerjaan Penggantian meter induk Distribusi Dia. 200 Dan Perbaikan Manhole Wilayah Pelayanan KCP. Tambe | S24 | 2024-09-03 | 2024-11-18 | 0190/11 | 3 | Detail |
| 0331/11/2024 | 32/Dist/PERUMDA TB-BKS/XI/2024 | USULAN BIAYA KEGIATAN INSIDENTIL BAGIAN DISTRIBUSI BULAN OKTOBER 2024 | P04 | 2024-11-04 | 2024-11-18 | 0189/11 | 3 | Detail |
| 0330/11/2024 | 053/01/S11/PERUMDA-TB/Bks/X/2024 | Usulan biaya pekerjaan pemasangan relokasi jembatan pipa GI 3" yang berada di kp.blukbuk desa.pantai bahagia kec.muara g | S11 | 2024-10-21 | 2024-11-18 | 0188/11 | 3 | Detail |
| 0329/11/2024 | 052/01/S11/PERUMDA-TB/Bks/X/2024 | Usulan biaya pekerjaan penyambungan pipa existing ke nonexisting yang berada di Kp.blukbuk Ds.pantai bahagia, Kp.muara g | S11 | 2024-10-21 | 2024-11-18 | 0187/11 | 3 | Detail |
| 0328/11/2024 | 051/01/S11/PERUMDA-TB/Bks/X/2024 | Usulan biaya pekerjaan perbaiakan kebocoran pipa 6" outlet booster anyer Kp.singkil Ds.pantai mekar | S11 | 2024-10-21 | 2024-11-18 | 0186/11 | 3 | Detail |
| 0327/11/2024 | 050/01/S11/PERUMDA-TB/Bks/X/2024 | Usulan biaya pekerjaan perbaikan kebocoran jaringan pipa JDU 8" jln.raya cabang bungin Kp.tapak serang rt/rw.001/001 per | S11 | 2024-10-21 | 2024-11-18 | 0185/11 | 3 | Detail |
| 0326/11/2024 | 048/01/S23/PERUMDA-TB/Bks/XI/2024 | Usulan Penggantian Water Meter Pelanggan PT. KPMS | S23 | 2024-11-15 | 2024-11-18 | 0184/11 | 3 | Detail |
| 0325/11/2024 | 045/01/S29/PERUMDA-TB/Bks/XI/2024 | PERMOHONAN PERAWATAN BERKALA SISTEM SCADA | S29 | 2024-11-18 | 2024-11-18 | 0183/11 | 3 | Detail |
| 0324/11/2024 | XXX | BIMBINGAN TEKNIS PENGELOLAAN ARSIP DINAMIS (GELOMBANG KE-4) | ASOSIASI ARSIPARIS INDONESIA | 2024-11-18 | 2024-11-18 | 2419 | 3 | Detail |
| 0323/11/2024 | HM.04.03/9301/Rek/2024 | UNDANGAN | SEKRETARIAT DAERAH KAB BEKASI | 2024-11-18 | 2024-11-18 | 2418 | 3 | Detail |
| 0322/11/2024 | 33/TST/PDAM/Bks/XI/2024 | LAPORAN KEGIATAN | P04 | 2024-11-18 | 2024-11-18 | 0182/11 | 3 | Detail |
| 0321/11/2024 | 2273/UN64.6/KM/2024 | PERMOHONAN IJIN KERJA PRAKTEK | UNIVERSITAS SINGAPERBANGSA | 2024-11-11 | 2024-11-18 | 2417 | 3 | Detail |
| 0320/11/2024 | 091/01/S17-1/PERUMDA-TB/Bks/XI/2024 | Usulan Permohonan Penebangan Pohon | S17 | 2024-11-05 | 2024-11-18 | 0181/11 | 3 | Detail |
| 0319/11/2024 | 142/SPI/PERUMDA-TB/BKS/XI/2024 | USULAN HONOR TIM EVALUASI KINERJA KCP TAMBELANG | P08 | 2024-11-18 | 2024-11-18 | 0180/11 | 3 | Detail |
| 0318/11/2024 | 141/SPI/PERUMDA-TB/Bks/XI/2024 | LAPORAN EVALUASI KINERJA KCP TAMBELANG | P08 | 2024-11-18 | 2024-11-18 | 0179/11 | 3 | Detail |
| 0317/11/2024 | PR.07/6185/Bappeda.1 | UNDANGAN | BAPPEDA | 2024-11-11 | 2024-11-18 | 2416 | 2 | Detail |
| 0316/11/2024 | 93/PT.AS/SPKS/X/2024 | TAGIHAN REKENING AIR BULAN OKTOBER 2024 | PT.AMARTHA SEJAHTERA | 2024-10-25 | 2024-11-18 | 2415 | 3 | Detail |
| 0315/11/2024 | XXX | BIAYA RAWAT INAP AN. TITANIA ZAHRA SANDHA P | PRIMAYA HOSPITAL | 2024-11-18 | 2024-11-18 | 2414 | 1 | Detail |
| 0314/11/2024 | 002/SP/ABP/XI/2024 | PERMOHONAN KERJASAMA INVESTASI PERUMAHAN (GRC 1) DAN PERUMAHAN GRAND KEDUNG WARINGIN JAYA | PT ALFHIAN BONARDO PERKASA | 2024-11-12 | 2024-11-18 | 2413 | 3 | Detail |
| 0313/11/2024 | 001/SP/SBP/XI/2024 | PERMOHONAN KERJASAMA INVESTASI PERUMAHAN (GCC 2) | PT ALFHIAN BONARDO PERKASA | 2024-11-12 | 2024-11-18 | 2412 | 3 | Detail |
| 0312/11/2024 | 38/PDK/Perumda-TB/Bks/XI/2024 | USULAN | P18 | 2024-11-15 | 2024-11-15 | 0178/11 | 3 | Detail |
| 0311/11/2024 | 77/BAPOR/PERUMDA-TB/BKS/XI/2024 | PERMOHONAN DISPENSASI | BAPOR | 2024-11-15 | 2024-11-15 | 2411 | 3 | Detail |
| 0310/11/2024 | 237/Us.Int/PERUMDA-TB/BKS/XI/2024 | USULAN BIAYA SPPD | P01 | 2024-11-15 | 2024-11-15 | 0177/11 | 3 | Detail |
| 0309/11/2024 | S-5064/UN2.F4.D1/PDP.01.01/2024 | PERMOHONAN IZIN SURVEI | UNIVERSITAS INDONESIA | 2024-11-13 | 2024-11-15 | 2410 | 3 | Detail |
| 0308/11/2024 | 236/Umum/Perumda-TB/Bks/XI/2024 | PERMOHONAN UPGRADE GENSET | P01 | 2024-11-15 | 2024-11-15 | 0176/11 | 3 | Detail |
| 0307/11/2024 | 218/01/S08-3/PERUMDA-TB/Bks/XI/2024 | Usulan Lembur Teknik | S08 | 2024-11-12 | 2024-11-15 | 0175/11 | 3 | Detail |
+ Tambah Surat Baru (INSERT tm_surat)
Backup data sebelumnya?